Construction Cost Estimator

Estimate Your Initial Construction Budget

Explore an early construction-budget range before detailed drawings and a project-specific RAB / BOQ are prepared. These broad 2026 Bali planning bands vary with design, specification, site conditions and scope.

Market reference ·

01Project Type
02Specification
03Building Area by Floor

Use the approximate built floor area—not the land area. Enter each floor separately; non-rectangular plans are welcome. Blank added floors are ignored.

Total Building Area0 m²
Optional planning settings

An optional planning buffer, not a construction markup. Shown separately from the construction estimate.

04 · Indicative planning range

Estimated Initial Construction Range

Enter your estimated building area to calculate an initial budget range.

Higher-specification or highly customized projects may exceed these planning bands. “+” means the upper allowance is not a price ceiling.

Calculated only in your browser. Inputs are not stored or transmitted by this tool. Only choosing WhatsApp shares the summary with WhatsApp.

Typically Not Included in This Quick Estimate

Budget separately unless explicitly incorporated in your project scope:

  • Land purchase / lease
  • Architecture / consultant fees
  • PBG / SLF and related permitting
  • Taxes
  • Swimming pool
  • Landscape
  • Loose furniture / FF&E
  • Appliances
  • Specialist engineering
  • Abnormal foundations / soil treatment
  • Retaining walls
  • Difficult site access
  • Major utility infrastructure

Scope varies between quotations. Confirm inclusions through a detailed RAB / BOQ.

05

What Can Move the Budget?

  • Site Condition
  • Access
  • Structure
  • Finishing
  • MEP
  • Design Complexity

06

Early Estimate vs Detailed RAB

Early Estimate

Built area × an indicative rate range. Useful for checking whether the scale of a project and its initial budget are aligned.

Detailed RAB / BOQ

Project-specific quantities, materials, labor, specifications, work volumes and unit prices. Requires a defined scope and technical information.

07

A Different Project Scope?

Hotels, commercial spaces and restaurants need a tailored preliminary estimate, not this house/villa model.

Discuss a Tailored Estimate (opens in a new tab)

Renovation budgets require an existing-condition review: demolition, hidden damage, reuse, structure and service rerouting can change the scope substantially.

Discuss a Renovation Project (opens in a new tab)

Indicative planning range

Bali Construction Planning Ranges — 2026

House

Simple
Rp4.0–4.8 million/m²
Mid-range
Rp4.8–6.0 million/m²
Premium
Rp6.0–8.0 million/m²

Villa

Standard
Rp6.0–7.5 million/m²
Mid-range
Rp7.5–10.0 million/m²
Premium
Rp10.0–13.0 million/m²
Luxury / Custom
Rp13.0–18.0+ million/m²

Higher-specification or highly customized projects may exceed these planning bands. “+” means the upper allowance is not a price ceiling.

Market References

The studio’s internal planning bands were compared with these published 2026 guides. Sources use different scopes and specification categories; some publish substantially higher villa rates. They are transparency references, not endorsements or official government prices.